Home > Buy Now > Construction Machinery > Other Construction Machinery > Cement Plant
 


Henan Zhongke Engineering & Technology Co.,Ltd
 
icon Products

line

icon Company Profile
icon Selling Leads
icon Buying Leads

line

 
Contact us
Henan Zhongke Engineering & Technology Co.,Ltd
[China]
Address:
2nd West Huagong Road, High&New Tech Development Aera Zhengzhou Henan 450001 China
Phone:
86-150381-70747
Contact name:
Maggie Tian , General Manager
Inquire now










Henan Zhongke Engineering & Technology Co.,Ltd



 
Products

Cement Plant

Inquire now

Cement Plant

Click to enlarge image

 Origin China
 Model Number 2000t/d
 Brand Name Zhongke

Rotary kiln and ball mill is a key equipment for regrinding. It is widely used for the cement, The silicate product, new type building material, fire-proof material, chemical fertilizer, black and non-ferrous metal, glass, ceramics and etc. Our ball mill Can grind ore or other materials that can be grinded either by wet process or by dry process.

Our advantages:
1. We have mastered advanced and mature new dry process engineering technology.
2. We are experienced in undertaking EPC(turnkey) or EP(division) contracts of large or medium scale cement production lines abroad.
3. Quotation system with high competitiveness and excellent cost performance.
If you have any interest in our products or company, please do not hesitate to contact us for more information.

Henan Zhongke Engineering & Technology CO.,Ltd Mainly manufacturing the cement mechanical equipments whose production capacity is 3000t, 1500t and 300t per day, and the metallurgical mechanical equipments, the chemical mechanical equipments, the electric mechanical equipments and the mining mechanical equipments, etc, as well as the rotary industrial furnaces, the tube ball mill, the dryer, the cooler, the crusher, the vertical shaft mill, the air-conditioning tower and the dust collector.



  Certificates Certificate Name Certificate Number
CE 200938457126
  Price USD   300000 / set
  Price Condition FOB   Tianjin
  Packaging In bulk
  Delivery lead time 60days after receiving the deposit
  Minimum order 1
  Supply ability 10

Inquire now